无锡市城北污水处理厂三期工程采用一体化奥贝尔(Orbal)氧化沟为主体的A2/O除磷脱氮工艺。介绍了一体化氧化沟在有条件放空的情况下实施清淤大修的施工实例,主要包括前期准备、放空要求、清淤方案、安全措施和实施过程等。
As the major part of A2/O phosphorus and nitrogen removal process, the integrativeOrbal oxidation ditch was applied on the third phase construction of Chengbei Wastewater Treat- ment Plant in Wuxi City. This paper introduced the dredging and maintenance construction of the integrative Orbal oxidation ditch under the situation of conditional emptying, including the prepara- tory, emptying requirements, dredging program, safety measures and the implementation process.