期刊文献+

基于任务的连续出动舰载机航空保障重调度研究 被引量:12

Rescheduling Study of Aircraft Support of Running Launch Aircraft on Carrier Based on Mission
下载PDF
导出
摘要 对舰载机和各种保障资源进行调度是提高舰载机航空保障效率、保证舰载机所承担作战任务顺利完成的有效手段。为了克服以往研究中没有考虑作战任务变更对舰载机航空保障调度的影响,使用重调度的理论与方法研究了基于任务的连续出动舰载机航空保障重调度问题,建立了连续出动舰载机航空保障重调度模型。采用免疫算法对模型进行求解,可以避免模型的解空间可能出现组合爆炸问题。最后通过一个实例表明该模型可以很好的应对由作战任务变更所引起的重调度问起,算法求解速度满足作战需求,从而验证了模型的准确性及算法的有效性。 Scheduling aircrafts on carrier and support resources is an efficient measure to advance efficiency of aircraft support and complete campaign mission of aircraft on carrier. In order to overcome effect brought by former study of aircraft support scheduling no considering mission changing, using rescheduling theory and method to study rescheduling of aircraft support based on mission, rescheduling model is set up. Using immune algorithm to solve the model can avoid potential "result-space exploding" problem. Ultimately, an example is provided to prove that rescheduling model can deal with changing mission well, and algorithm can satisfy campaign requirement, and verify the accuracy of the model and the effectiveness of the algorithm.
出处 《指挥控制与仿真》 2012年第3期23-26,34,共5页 Command Control & Simulation
关键词 舰载机 航空保障 重调度 柔性流水车间 免疫算法 aircraft on carrier aircraft support rescheduling flexible flow shop immune algorithm
  • 相关文献

参考文献5

二级参考文献44

  • 1郭永辉,钱省三.基于鼓-缓冲器-绳子理论的整合式生产作业控制系统研究[J].计算机集成制造系统,2006,12(2):252-256. 被引量:10
  • 2左燕,谷寒雨,席裕庚.大规模流水线调度的瓶颈分解算法研究[J].控制与决策,2006,21(4):425-429. 被引量:10
  • 3李铁克,周健,孙林.连铸连轧和冷装热轧并存环境下的炼钢-连铸生产调度模型与算法[J].系统工程理论与实践,2006,26(6):117-123. 被引量:18
  • 4Salvador M S. A solution to a special case of flow shop scheduling problems [J].European Journal of Operational Research, 2001,132 : 528-- 538.
  • 5Hoogeveen J A, Lenstra J K, Veltman B. Minimizing the makespanin a multi processor flowshop is strongly NP- hard[J]. European Journal of Operational Research(to appear), 2006,33 (5) : 1399 -- 1419.
  • 6Gupta J N D. Two - stage hybrid flowshop scheduling problem[J]. Journal of Operational Research Society, 1988,344:359--364.
  • 7Artbanari I S, Ramamurthy K G. An extension of two mac hines sequencing problem[J].Opsearch, 19 71, (8) : 10--11.
  • 8Hunsueker J L,Brah S A,Santos D L. Simulation study of a flow shop with multiple processors scheduling [C]. TIMS/ORSA Joint National Meeting in New York City, October, 1989.
  • 9Brah S A, Loo L L. Heuristics for scheduling in a flowshop with multiple processors[J]. European Journal of Operational Research, 1999,11(3) : 113-- 122.
  • 10Kim M,Jung J H,L ee I B. Intelligent scheduling and monitoring for multi - product networked batch processes [J]. European Symposium on Computer Aided Process Engineering, 1996,6B: 1149-- 1154.

共引文献29

同被引文献99

引证文献12

二级引证文献65

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部