摘要
以螺洲大桥中南汊桥梁工程的实例为背景,详细介绍了移动模架法施工预应力现浇箱梁的工艺技术,阐述了移动模架系统的组成及工艺流程,并与满堂支架施工法做相应的对比,得出移动模架工法的优缺点及适应情况。
This paper presents the construction technology for cast--in--situ box girders which located in Central South Inlet of Luozhou Bridge with slide shuttering method, and details of the compositions, working principles, and the advantages and disadvantages and applicability comparing to the method of full scaffold.
出处
《福建建筑》
2012年第5期86-88,共3页
Fujian Architecture & Construction
关键词
移动模架
预应力混凝土箱梁
连续梁
施工技术
Slide shuttering
Prestressed concrete box girder
Continuous girder
Construction technology