摘要 针对第Ⅱ类装配线平衡问题,提出一种基于可行装配序列的改进蚁群算法。算法基于可选操作集合的动态改变和工位作业时间优化目标的更新,给出操作分配至工位的分配准则。针对该问题的特点,提出工位和操作间的信息素、操作和操作间的信息素两种信息素。蚂蚁根据前者和启发式因素的权值为当前工位随机选择一项操作为该工位的首项操作,依据后者和启发式因素的权值为已选操作组合随机选择一项操作作为其组合操作。利用与经典测试算例的比较及工业实例的运行,验证了算法的正确性和工业应用优势。 Aiming at the type Ⅱassembly line balancing problem(SALBP-2),an improved ant colony optimization based on feasible assembly sequences was proposed.Based on the dynamic changes of candidate task set and the updating of station time optimization goal,a principle of assigning task to station was designed.By taking the characteristics of SALBP-2 into consideration,two pheromones were introduced into algorithm,which included station and task,task and those just among tasks.Ants selected the first task to station randomly according to the first pheromone and the weight of heuristic factors,and selected other tasks to station randomly according to the second pheromone and the weight of heuristic factors.Through the operation of industrial case and the comparison with classic test example,the validity and efficiency of the proposed algorithms was confirmed.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2012年第5期999-1005,共7页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(50875190 61074036) 武汉科技大学节能减排中心开放基金资助项目(B1019) 冶金工业过程系统科学湖北省重点实验室开放基金资助项目(Y201109)~~
关键词 蚁群算法 装配线平衡 NP难问题 ant colony optimization assembly line balancing NP hard problem
  • 相关文献

参考文献20

  • 1BARTHOLDI J J. Balancing twcsided assembly lines: a case studyEJ-]. International Journal of Production Research, 1993, 31(10) :2447-2461,.
  • 2SOPHIE D L, ANGEL R, SORIANO P. Balancing assembly lines with tabu searchJ]. European Journal o Operational Research, 2006,168(3) : 826-837.
  • 3GUTJAHR A L, NEMHAUSER G L. An algorithm for tb, e line balancing problemFJ ]. Management Science, 1964, 11 ( 2 ) : 308-315.
  • 4ARCUS A L, COMSOAL. A computer method of sequencing operations for assembly linesEJ. International Journal of Pro duction Research, 1996,4(4) : 259-277.
  • 5BOCTOR F F. A multiple-rule heuristic for assembly line bal- ancingEJ-]. Journal of the Operational Research Society, 1995, 46(1) :62-69.
  • 6GHOSH S, GAGNON R J. A comprehensive literature review and analysis of the design, balancing and scheduling of assem bly lines EJ. International Journal of Production Research, 1989,27 (4) : 737-670.
  • 7SCHOLL A, KLEIN R, SALOME. A bidirectional branch and bound procedure for assembly line balancing[-J. Informs .loumal on Comoutin, 1997,9(4).. 319-334.
  • 8SCHOLL A, KLEIN R. Balancing assembly lines effectively a computational comparisonJ]. European Journal of Operational Research, 1999,114( 1 ) .. 50-58.
  • 9SCHOLL A, BECKER C. State-othe art exact and heuristic solution procedures for simple assembly line balancingEJ3. Eu- ropean Journal o[ Operational Research, 2006, 168 (3).- 666-693.
  • 10KLEIN R, SCHOLL A. Maximizing the production rate in simple assembly line balaneing-a branch and bound procedure J]. European Journal of Operational Research, 1996,91(2) : 367-385.

二级参考文献29

  • 1万旭,林健良,杨晓伟.改进的最大-最小蚂蚁算法在有时间窗车辆路径问题中的应用[J].计算机集成制造系统,2005,11(4):572-576. 被引量:43
  • 2Bartholdi J J.Balancing two-sided assembly lines:A case study[J].International Journal of Production Research,1993,31:2 447-2 461.
  • 3Talbot F B,Patterson J H,Gehrlein W V.A comparative evaluation of heuristic line balancing techniques[J].Management Science,1986,32:430-454.
  • 4Scholl A,Becker C.State-of-the-art exact and heuristic solution procedures for simple assembly line balancing[J].European Journal of Operational Research,2006,168(3):666-693.
  • 5Lapierre S D,Ruiz A,Soriano P.Balancing assembly lines with tabu search[J].European Journal of Operational Research,2006,168(3):826-837.
  • 6Baybars I.A survey of exact algorithms for the simple assembly line balancing problem[J].Management Science,1986,32:240-253.
  • 7Klein R,Scholl A.Maximizing the production rate in simple assembly line balancing-a branch and bound procedure[J].European Journal of Operational Research,1996,91(2):367-385.
  • 8张则强,程文明,钟斌,王金诺.求解装配线平衡问题的一种改进蚁群算法[J].计算机集成制造系统,2007,13(8):1632-1638. 被引量:36
  • 9Chow We-Min. Assembly line design [ M ]. USA:IBM Corporation, 1990.
  • 10Rekiek B, De Lit P, Pellichero F, et al. Applying the equal piles problem to balance assembly lines [A]. International Symposium on Assembly and Task Planning[C]. Porto. Portugal, 1999.

共引文献58

同被引文献42

引证文献8

二级引证文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部