期刊文献+

某外海工程超长大直径钢管桩变形原因简析与加强方案研究 被引量:1

Deformation analysis of a long large-diameter steel pipe pile and its strengthening plan
下载PDF
导出
摘要 某外海工程在沉设超长大直径钢管桩施工过程中,发生钢管桩在海床泥面附近严重变形的情况。通过对本工程超长大直径钢管桩产生变形的可能性原因进行分析,同时对其变形处局部加强处理方案进行一系列的研究论证,并对加强处理方案进行比选优化后,最后采用一可靠的加强处理方案。为类似工程避免发生此类质量事故和钢管桩局部变形水下加强处理提供参考。 In the construction process of a long large-diameter steel pipe pile, the steel pipe pile in the vicinity of the seabed soil has a serious accident deformation. The purpose of this paper is to make an analysis of various possibilities of the deformation and at the same time to conduct a series of feasibility studies to enhance the treatment of the deformed pipe line, and to finally adopt a reliable strengthening plan. It is hoped that this paper can give some beneficial ideas to similar projects to avoid such accidents and improve the quality of under, rater steel Dine piles.
出处 《海洋工程》 CSCD 北大核心 2012年第2期136-142,共7页 The Ocean Engineering
关键词 外海工程 钢管桩 水下加强 水下灌浆 off work steel pipe pile underwater strengthening underwater grouting
  • 相关文献

参考文献4

  • 1胡晓伦,杨江虎.杭州湾大桥钢管桩沉桩施工工艺[J].桥梁建设,2006,36(1):52-55. 被引量:26
  • 2交通部第一航务工程勘察设计院.海港工程设计手册(下册)[M].北京:人民交通出版社,1996:79-198.
  • 3GB50017-2003.钢结构设计规范[S].[S].,2003..
  • 4JGJ82-91,钢结构高强度螺栓连接的设计、施工及验收规程[S].1991.

二级参考文献5

  • 1路桥建设杭州湾大桥Ⅳ合同项目经理部.杭州湾跨海大桥Ⅳ合同钢管桩沉桩施工方案[R].,2004..
  • 2.杭州湾跨海大桥专用施工技术规范[s].[S].杭州湾大桥工程指挥部,2003..
  • 3JTJ249—200l.港口工程桩基动力检测规程[s].[S].,..
  • 4.杭州湾跨海大桥工程测量专用规范[s].[S].杭州湾大桥工程指挥部,2003..
  • 5同济大学.海上打桩GPS-RTK定位系统[R].上海:上海市科学技术委员会,2004..