机组通流增容改造及出现问题与对策

The problems and countermeasures of capacity increment reformation of the generating units
下载PDF
导出
摘要 湛江电厂300MW机组增容通流改造内容,及改造后效果,厂用电率、供电煤耗降低,汽轮机效率提高。改造后调门连杆设计不舍理,频繁出现门杆弯曲,调门失控现象,重新设计了现场LVDT杆连杆和阀体的传动机构,解决调门失控问题。 This thesis shows the content of capacity increment reformation of the generating units (300MW) in Zhanjiang power plant and the effects after reformation, the decrease of power consumption rate and coal consumption rate, the rising efficiency of steam turbine rate. After the reformation, the connecting rod frequently was bent, the control valve was out of control, and the design of control valve appeared unreasonable. And then redesign the LVDT connecting rod and the valve transmission mechanism, which could solve the problem of control valve out of control.
作者 林蔚
出处 《贵州电力技术》 2012年第5期16-19,共4页 Guizhou Electric Power Technology
关键词 通流增容改造 效果 门杆弯曲 解决 throughflow capacity extension effect bend valve lever solution
  • 相关文献

参考文献1

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部