摘要
以清江梯级电站汛期为长江洪水错峰预留的10亿m3防洪库容在水布垭水库和隔河岩水库的分配方案为研究对象,以梯级电站整体发电效益最大为目标,建立模拟梯级电站联合调度模型。采用1951~2011年日径流资料对模型进行验证,发电效益有明显增加。
The allocation scheme of 109 m3 flood control capacity in Shuibuya reservoir and Geheyan reservoir, reserved by Qingjiang Cascade Hydropower Stations for peak-alternation of the Yangtze River flood during flood season, is taken as research subject. A simulation model of the united regulation of the cascade hydropower stations is built with the tar- get of maximum power generation benefit of the cascade hydropower stations. The model verified by daily runoff data from year 1950 to year 2011 shows that the power generation benefit increases evidently.
出处
《水电与新能源》
2012年第3期54-56,共3页
Hydropower and New Energy
关键词
防洪库容
分配方案
发电效益
清江梯级电站
flood control capacity
allocation scheme
power generation benefit
Qingjiang cascade hydropower stations