摘要
本文引进集对分析中的同异反联系数 a+ bi+ cj来刻划含有突发性的网络工序时间 。
Because of accidents,the case of time limit be largely delayed is common in practical constraction of a project. This paper firstly uses the connection number a+b i +c j to express the time uncertainty and time delay caused by accidents for a process in a project,studies the determination mothod of a critical path and the condition of an uncritical path change into a critical path etc.