摘要 针对常规建模方法在庞大复杂风电机组应用上的不足,在建立单台风电机组全参数化模型的基础上,以风电机组序列整体为研究对象,根据同序列不同功率机组之间各零部件设计参数变化规律,研究应用二次参数化技术和参数序列化方法实现了高效的风电机组模型建立与管理;并结合三维模型参数驱动技术,研发了风电机组序列建模系统,可有效减少建模和造型工作量、降低设计失误率、提高设计效率,验证了该建模方法的正确性与合理性。 According to the disadvantages of conventional modeling methods for large and complex wind turbines,a highly efficient modeling method is proposed in this paper.Based on a fully parametric model of a single wind turbine,it took the whole sequence of wind turbines as the research object,and realized the fast modeling via secondary parametric technology according to the change law of design parameters of different wind turbines in the same sequence.A sequence modeling system for wind turbines was also developed by combining with parameter-driven modeling technology.The system can effectively reduce the workload and design error rate,improve design efficiency,and prove the correctness and rationality of the modeling method.
出处 《图学学报》 CSCD 北大核心 2012年第3期129-134,共6页 Journal of Graphics
基金 中央高校基本科研业务费专项资金资助项目(12MS04)
关键词 计算机应用 风电机组 二次参数化 序列化建模 computer application wind turbine secondary parametric technology sequence modeling
  • 相关文献

参考文献3

二级参考文献27

  • 1李晶,宋家骅,王伟胜.大型变速恒频风力发电机组建模与仿真[J].中国电机工程学报,2004,24(6):100-105. 被引量:274
  • 2李东东,陈陈.风力发电机组动态模型研究[J].中国电机工程学报,2005,25(3):115-119. 被引量:182
  • 3杨秀媛,肖洋,陈树勇.风电场风速和发电功率预测研究[J].中国电机工程学报,2005,25(11):1-5. 被引量:584
  • 4刘其辉,贺益康,张建华.交流励磁变速恒频风力发电机的运行控制及建模仿真[J].中国电机工程学报,2006,26(5):43-50. 被引量:204
  • 5项真.异步式风力发电系统的运行特性研究[D].上海上海交通大学,2007.
  • 6Pena R,Clare J C, Asher G M. Doubly fed induction generator using back-to-back PWM converters and its application to variable-speed wind-energy generation [ J]. IEE Proc on Power Appl, 1996,143 (3) : 231-241.
  • 7Boldea I,Tutelea L, Serban I. Variable speed electric generators and their control: an emerging technology [ J] . Journal of Electrical Engineering,2002 ( 3 ) : 20 -28.
  • 8Clemens Jauch Julijia Matevosyan, Thomas Ackermann Sigaid Bolik. International comparison of requirements for connection of wind turbines to power systems[J]. Wind Energy, 2005, 8(3): 295-306.
  • 9Chen Z. Issues of connecting wind farms into power systems[C]. 2005 IEEE/PES Transmission and Distribution Conference& Exhibition: Asia andPacific, Dalian, China, 2005.
  • 10Ledesma P, Usaola J, Rodriguez J L. Transient stability of a fixed speed wind farm[J]. Renewable Energy, 2003, 28(9): 1341-1355.

共引文献67

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部