摘要
介绍了潍坊发电厂 1号机组协调控制系统改造与调试的情况 。
In this paper,the situation of the reform and commission of Weifang power plant No.1 unit coordinate control system are introduced,as well as effective measures to solve the typical problem are provided.
出处
《山东电力技术》
2000年第2期6-7,32,共3页
Shandong Electric Power