摘要
论述了加拿大从1974年至今的乏燃料地质处置的研发工作,并对2002年以后研发工作中的某些问题进行了较详细的介绍:加拿大核废物管理机构、加拿大第4个乏燃料处置方案——可调整的分期管理(APM)方案的产生、APM方案的特点及其实施的技术路线,以及今后5 a(2011~2015年)的战略计划。
The R&D program of geological disposal of spent fuel in Canada from 1974 to present day is discussed in this paper. The R&D activities since 2002 are presented here in more detail for some issues, such as the organization of NWMO, the fourth disposal option of spent fuel in Canada-Adaptive Phased Management (APM), its origin, its feature, its technical route for implementation and its strategic plan for 2011-2015.
出处
《世界核地质科学》
CAS
2012年第2期99-105,共7页
World Nuclear Geoscience