期刊文献+

基于MRO服务提供商的设备预维修调度 被引量:5

Pre-maintenance Scheduling with MRO Service Provider
下载PDF
导出
摘要 为了解决MRO服务提供商的预维修调度问题,提出了基于设备故障预期的预维修人员优化调度方法。在该研究方法中,分析了MRO服务提供模式及其优点,建立了基于设备故障统计分布的预维修计划时间优化模型,根据模型确定设备的预维修计划时间,建立了设备预维修调度模型,采用量子粒子群算法对模型求解,并比对基于预维修计划时间的先来先服务方法。最后,通过实例示例了基于MRO服务提供商的预维修调度的求解过程,并对结果进行了分析,保证了模型的合理性及算法求解的有效性。 The problem of pre-maintenance scheduling of MRO service provider is studied. A staff scheduling method based on anticipated equipment failure was developed. MRO service providing pattern and its advantages are discussed firstly. Then, the pre-maintenance optimization model based on the statistical distribution of equipment failure times was established. The quantum particle swarm optimization is used for solving the model, and compared with First Come First Service (FCFS) method. Finally, a case study is presented to demonstrate the solution process of the pre-maintenance scheduling with MRO service provider. The results show the model is appropriate and the algorithm is effective.
出处 《系统管理学报》 CSSCI 2012年第3期336-340,351,共6页 Journal of Systems & Management
基金 高等学校博士点基金资助项目(20093120110008) 上海市重点学科建设项目资助(S30504)
关键词 MRO服务 调度 量子粒子群算法 先来先服务 MRO service scheduling quantum particle swarm optimization FCFS
  • 相关文献

参考文献15

  • 1Luke T M,Chan S P. Economic analysis in the MRO industry: An options approach [J]. The Engineering Economist, 2004,49 ( 1 ) : 21-41.
  • 2Ho Y C,Chuan O C,Wang W B. An empirical study of key success factors for six sigma green belt projects at an asian MRO company [J]. Journal of Air Transport Management, 2008,14 (1): 263-269.
  • 3Ashutosh S, Pratap K J M. Maximum utilization of vehicle capacity.. A case of MRO items[J]. Computers Industrial Engineeringt, 2008,54 : 185-201.
  • 4Mercelis L. Algorithm for MRO materials management[J]. Engineering Costs and Production Economics, 1989,18 : 181-186.
  • 5刘化深,杨建华,莫蓉,杨海成.大型装备MRO服务链信息化框架模型[J].工业工程,2008,11(6):38-42. 被引量:12
  • 6敬春菊,冯珍.基于MRO采购策略的供应商选择模型构建[J].数学的实践与认识,2009,39(14):42-47. 被引量:6
  • 7刘晓华,纪正广.中小机械制造企业MRO采购模式研究[J].物流工程与管理,2009,31(11):68-70. 被引量:15
  • 8Worrall B M, Mert B. Application of Dynamic Scheduling Rules in Maintenance Planning and Scheduling[J].Production Research, 1980,18:57 71.
  • 9Sriram C, HaghaniA. An optimization model for aircraft maintenance scheduling and reassignment[J].Transportation Research, PartA, 2003, 37 (1): 29-48.
  • 10厉红,钱省三.半导体制造设备的维修调度研究[J].中国机械工程,2006,17(16):1693-1697. 被引量:11

二级参考文献31

共引文献64

同被引文献64

  • 1李彤,王春峰,王文波,宿伟玲.求解整数规划的一种仿生类全局优化算法——模拟植物生长算法[J].系统工程理论与实践,2005,25(1):76-85. 被引量:146
  • 2何晓晖,王建平,李峰,魏锋利.工程装备维修任务分派的模糊决策[J].现代制造工程,2006(5):112-114. 被引量:2
  • 3陈宁,章雪岩,武振业,陈石.基于随机理论的多项目资源配置模型及应用研究[J].中国管理科学,2006,14(4):75-80. 被引量:4
  • 4厉红,钱省三.半导体制造设备的维修调度研究[J].中国机械工程,2006,17(16):1693-1697. 被引量:11
  • 5CAI X,LI K N.A genetic algorithm for scheduling staff of mixed skills under multi-criteria[J].European Journal of Operational Research,2000,125 (2):359-369.
  • 6KAI PAN,DONG ZHANG.A Three-Phase Approach to Service Staff Assignment for MRO Tasks[C]//Proceedings of IIE Asian Conference 2011,Shanghai,China:Shanghai Jiao Tong University Press,2011:612-622.
  • 7李旭,祁国宁.复杂装备MRO服务的若干关键技术研究[D].杭州:浙江大学,2012,3.
  • 8Li F, Xu L D, Jin C, Wang H. Random assignment method based on genetic algorithms and its applica- tion in resource allocation [ J ]. Expert Systems with Applications, 2012,39 ( 15 ) :12213-12219.
  • 9Ekpenyong U E, Zhang J, Xia X. An improved robust model for generator maintenance scheduling [ J 1. E- lectric Power Systems Research, 2012,92:29-36.
  • 10Bruni M E, Beraldi P, Guerriero F, Pinto E. A heu- ristic approach for resource constrained project sched- uling with uncertain activity durations [ J ]. Comput-ers & Operations Research, 2011,38 (9) : 1305 - 1318.

引证文献5

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部