摘要
结合京石高铁永定河特大桥跨北拒马河(40+56+40)m连续梁悬浇施工,根据Ⅱ型轨道板梁面结构类型及几何尺寸,阐述了悬壁浇筑施工Ⅱ型轨道板梁面成型及箱梁线形控制措施,以指导现场施工,保证连续梁质量。
Combining with the (40 + 56 + 40)m continuous girder by free cantilever casting construction of Yongdinghe super-large Bridge spanning Beijuma River along Beijing-Shijiazhuang express railway, the study illustrates the beam deck at II -type rail plate and box girder linear con- trolling measures in the free cantilever casting construction, so as to direct the field construction and ensure the quality of the continuous beam.
出处
《山西建筑》
2012年第18期169-170,267,共3页
Shanxi Architecture
关键词
高铁
连续梁
悬壁浇筑
Ⅱ型轨道板
线形监控
技术措施
express railway, continuous beam, free cantilever casting, II-type rail plate, linear inspection, technical measures