期刊文献+

地铁施工引起地下管线变形的安全评估方法及其应用 被引量:2

Security assessment method for the deformation of underground pipeline caused by the subway construction and its application
下载PDF
导出
摘要 研究地铁施工引起地下管线变形的安全评估方法,分析三点共圆法求算管线变形曲率中测点间距和测量误差的影响,并对其适用性及相关问题进行了探讨;提出利用六次多项式曲线拟合求算管线变形曲率的方法,并结合工程实例阐述其应用。 In this paper the security assessment method of underground pipeline caused by the subway construction was studied, and analysis on the effect of measuring point spacing and measurement error in the pipeline deformation curvature calculation by three-point cyclic method was conducted, its applicability and related issues were discussed. The method of using six polynomial curve fitting to calculate pipeline deformation curvature was proposed, and combining with the engineering examples, its application was discussed.
出处 《中国安全生产科学技术》 CAS 2012年第5期81-86,共6页 Journal of Safety Science and Technology
关键词 地铁施工 地下管线 三点共圆 曲线拟合 安全评估 subway construction underground pipeline three-point cyclic polynomial curve fitting security assessment
  • 相关文献

参考文献9

  • 1Attewell P B,Yeates J,Selby A R. Soil Movements Induced by Tunneling and Their Effects on Pipelines and Structures[M].London:Blackie and Son Ltd,1986.
  • 2刘建航;侯学渊.基坑工程手册[M]北京:中国建筑工业出版社,1997.
  • 3孙平,朱伟,邢涛.城市地下管线系统可靠性分析[J].中国安全生产科学技术,2009,5(4):191-194. 被引量:2
  • 4吴波.城市地下工程技术研究与实践[M]北京:中国铁道出版社,2008.
  • 5顾孝烈;鲍峰;程效军.测量学[M]上海:同济大学出版社,1999.
  • 6孙训方.材料力学[M]北京:高等教育出版社,2002.
  • 7程正兴.数据拟合[M]西安:西安交通大学出版社,1984.
  • 8Dill J. An application of color graphics to the display of surface curvatures[J].Computers and Graphics,1981,(15).
  • 9侯莹,伍彬彬,邓云峰,唐玉杰.集输管线安全管理与应急系统的研究[J].中国安全生产科学技术,2011,7(2):98-103. 被引量:12

二级参考文献12

共引文献12

同被引文献18

引证文献2

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部