摘要 论述了承压水对高层建筑基坑支护、桩基础、抗浮锚杆(桩)施工的不利影响。结合工程实例,介绍了喷射注浆止水墙处理承压水的设计方法,并分析了总施工顺序、涌水钻孔处理和地下水水位观测等关键技术问题。 The unfavorable effects of confined water were discussed briefly on the construction of foundation pit support, pile foundation and anti-float anchor (pile) for high-rise building. Combined with a engineering project, the design method of jet grouting cut-off wall in confined aquifer was elaborated. Key techniques, such as general construction sequence, treatment of gushing water in prospect hole and ground water--level observation, were also analysed in this Paper.
出处 《岩土工程技术》 2012年第3期159-162,F0003,共5页 Geotechnical Engineering Technique
关键词 承压水 喷射注浆止水墙 降水 基坑支护 confined water jet grouting cut-off wall dewatering foundation pit support
  • 相关文献

参考文献4

  • 1JGJ120-99建筑基坑支护技术规程[S].北京:中国建筑工业出版社,1999
  • 2JGJ79-2002 建筑地基处理技术规范[S].北京:中国建筑工业版社,2002.
  • 3王军连.工程地下水计算[M].北京:中国水利水电出版社,2003.
  • 4GB50007--2002建筑地基基础设计规范[S].北京:中国建筑工业出版社,2002:94—96.

共引文献117

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部