根据包西铁路大断面红黏土隧道新九燕山隧道施工实例,就斜井和大跨度红黏土隧道交叉口施工方案进行选择,并对斜井向正洞施工方法的转化、施工技术措施等进行阐述。
This paper, taking construction of the New Jiuyanshan Tunnel, a red clay tunnel with a large section of Baoxi Railway as an instance, makes a choice of the construction program for the intersection between the inclined shaft and large- span red clay tunnel among three alternatives as well as conducts an elaboration and verification of the transformation in the construction way from inclined shaft to main cavity and the adoption of the construction measures.
出处
《铁道建筑技术》
2012年第5期1-3,共3页
Railway Construction Technology
关键词
隧道施工
大断面
红黏土
辅助坑道
交叉口
tunnel construction
large section
red clay
auxiliary tunnel
intersection