摘要
介绍自动化驼峰的试验全部过程,通过试验,为驼峰能够完全按照严密的联锁关系开通及运营提供了有力的技术保障,不但缩短了施工时间,而且使运营更加安全可靠。通过理论结合实际,将驼峰这个联锁关系比较独立且复杂的站场进行整体化,对驼峰与到达场的联锁关系进行阐述。
All process of hump test is introduced, which provides a powerful technical support for hump operation according to strict interlocking relationship, it not only shortens the construction time, but also improves the operation safety and reliability. By combining theory with practice, the hump which have a complex and independent interlocking relationship are integrated, the interlocking relationship between the hump and reach field are presented.
出处
《铁道建筑技术》
2012年第5期60-64,65,共6页
Railway Construction Technology