1WEMMERLOV U, JOHNSON D J. Cellular manufacturing at 46 user plants: implementation experiences and performance improvements [J]. International Journal of Production Research, 1997,35(1) :29-49.
2WIENDAHLHP.面向负荷的生产控制[M].北京:清华大学出版社,1999.127-146.
3SEEHOF J M,EVANS W O. Automated layout design program[J]. Journal of Industrial Engineering, 1967,18(1): 690-695.
4WEMMERLOV U, HYER N L. Cellular manufacturing in the US industry:A survey of users[J]. International Journal of Production Research, 1989,27(9):1511-1530.
5DAS S. A facility layout method for flexible manufacturing systems [J]. International Journal of Production Research, 1998,36(1) :279-297.
1Uzsoy R,Martinvega L A,LEE C Y. Production scheduling algorithms for a semiconductor test facility[J].{H}IEEE Transactions on Semiconductor Manufacturing,1991,(04):270-280.doi:10.1109/66.97809.
2Quadt D,Kuhn H. Capacitated lot-sizing and scheduling with parallel machines,back-orders,and setup carryover[J].{H}NAVAL RESEARCH LOGISTICS,2009,(04):366-384.
3Song Y,Zhang M T,Zhang L. ACO algorithm for machine conversion reduction in semiconductor assembly manufacturing[A].San Jose,USA,2005.339-343.
4Rajendran C,Ziegler H. Ant colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs[J].{H}European Journal of Operational Research,2004,(02):426-438.
5Davis L. Handbook of genetic algorithms[M].{H}New York:Van Nostrand Reinhold,2000.
6Srinivas M. Adaptive probability of crossover and mutation in genetic algorithm[J].IEEE Transactions on System Man Cyber,1994,(04):665-667.