浅埋煤层末采期间矿压规律及顶板管理技术 被引量:9

Mine Pressure Behavior Law and Roof Control Technology in Concluding Mining Period of Shallow Seam
下载PDF
导出
摘要 对万利一矿42202大采高综采工作面末采期间进行了矿压实测与分析。结果表明:末采期间虽然降低了采高,但由于工作面推进速度较慢,给上覆岩层留下了足够的运动时间,与正常回采期间相比,来压强度和持续距离都增加了。采用强力垛式支架有效维护了回撤通道的顶板,但正帮变形严重。基于末采期间矿压规律制定的顶板管理技术措施对保证工作面安全、快速和高效回撤具有重要意义。 A site mine pressure measurement and analysis were conducted in No.42202 fully mechanized high cutting coal mining face in Wanli No.1 coal mine in the concluding mining period.The results showed that even though reducing the mining height during the concluding mining,the slower face advancing supplies plenty time to the overburden to motion.Compared with the normal recovery period,the pressure strength and sustaining distance increased.Crib stands with strong support resistance maintenance the roof of the retracement channel effectively,but the normal deformed seriously.The roof control technical based on the pressure law of mining in concluding mining period ensures the removing of the mining face safely,fastly and efficiently,it has great significance.
出处 《山西焦煤科技》 2012年第5期25-27,37,共4页 Shanxi Coking Coal Science & Technology
关键词 浅埋煤层 末采 矿压规律 顶板管理 Shallow seam Concluding mining Mine pressure behavior law Roof control
  • 相关文献

二级参考文献16

共引文献109

同被引文献46

引证文献9

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部