摘要
黔中石漠化山区进行基础设施建设,路桥建设要切开山体,在碳酸盐岩山体中开切陡边坡。研究贵阳石漠化山区公路边坡植被恢复的可能性及速率,可为石漠化治理提供参考。
Stone desertification in the mountainous areas of infrastructure, road and bridge construction to cut the mountain, the steep slope in the cutting carbonate rock. The possibility of recovery and the rate of Guiyang rocky desertification in mountain highway slope vegetation, provide a reference for rocky desertification control.
出处
《兴义民族师范学院学报》
2012年第1期18-21,98,共5页
Journal of Minzu Normal University of Xingyi
关键词
山区公路
石漠化
植被
Mountain area highway
Stone desertification
Vegetation