1Aksoy, H. K., & Gupta, S. M. (2005). Buffer allocation plan for a remanufacturing cell. Computers and Industrial Engineering, 48, 657-677.
2Amezquita, T., & Bras, B. (1996). Lean remanufacture of an automobile clutch. Proceedings from International Working Seminar on Reuse, Eindhoven.
3Baudin, M. (2002). Lean assembly. New York, N.Y.: Productivity Press.
4Bouzon, M., Cardoso, C. L., Queiroz, A. A., & Gontijo, L. A. (2010). Practical-theoretical overview of product recovery environment: A case study in a telecom remanufacturing. Proceedings from XXXENEGEP, Silo Carlos.
5Guide Jr, V. D. R., Jayaraman, V., & Srivastava, R. (1999). Production planning and control for remanufacturing: A state-of-the-art Survey. Robotics and Computer-Integrated Manufacturing, 15, 221-230.
6Guide Jr., V. D. R., Souza, G. C., & Van Der Laan, E. (2005). Performance of static priority rules for shared facilities in a remanufacturing shop with disassembly and reassembly. European Journal of Operational Research, 164, 341-353.
7Hunter, S. L. & Black, J. T. (2007). Lean remanufacturing: A cellular case study. Journal of Advanced Manufacturing Systems, 6, 129-144.
8Hyer, N., & WemmerlOv, U. (2002). Reorganizing the factory. New York, N.Y.: Productivity Press.
9ljomah, W. L., Mcmahon,C. A., Hammond, G. P., & Newman, S. T. (2007). Development of design for remanufacturing guidelines to support sustainable manufacturing. Robotics and Computer-Integrated Manufacturing, 23, 712-719.
10Kucner, R. J. (2008). A Socio-technical study of lean manufacturing deployment in the remanufacturing Context (Ph.D. thesis presented at University of Michigan, Detroit).