摘要
以澜沧江乌弄龙水电站的渣场治理为例,介绍了采用加筋格宾挡墙配合雷诺护垫及麦克护垫技术的结构设计、施工工艺、工程安全监测原则,在满足渣场治理使用功能的前提下,体现了渣场综合治理的整体优势。实践表明,该挡墙技术成本低、施工效率高、稳定性好、抗冲刷能力强、耐久性、环保生态效果好。
Taking management of residue field of Wunonglong hydropower station in Lancanjiang River for an example,this paper presents the principles of structure design,construction technology and safety monitoring based on reinforced gabion retaining wall with Reynolds mat and Mike pad.On the premise of meeting the normal function of residue field harnessing,it embodies the whole advantages.The results show that the proposed techniques of retaining wall has some characteristics of low cost,high construction efficiency,good stability,strong erosion resistance,perfect durability,good ecological and environmental protection effect.
出处
《水电能源科学》
北大核心
2012年第6期124-127,共4页
Water Resources and Power
关键词
渣场治理
加筋带格宾挡墙
加筋雷诺护垫
加筋麦克护垫
施工工艺
residue field harnessing
reinforced gabion retaining wall
reinforced Reynolds mat
reinforced Mike pad
construction technology