期刊文献+

一种柔性路径下的跨单元调度方法 被引量:7

An Inter-cell Scheduling Approach Considering Flexible Processing Routes
下载PDF
导出
摘要 针对单元制造系统(Cellular manufacturing system,CMS)中需要多个单元协作完成的特殊工件,提出柔性路径下跨作业(Job shop)单元的特殊工件调度方法—基于信息素的方法(Pheromone-based approach,PBA).基于多Agent对单元制造系统建立模型,提出了冗余单元的概念,建立了多Agent之间的协商机制.同时通过建立Agent联盟,减少通信量的同时增强系统的鲁棒性和调度优化的全局性.实验结果表明,与常见的组合调度规则相比,本文提出的方法在5种性能指标上具有显著优势. Aiming at the problem of scheduling in cellular manufacturing system(CMS) with exceptional parts that need to visit machines located at multiple job shop cells,a pheromone-based approach(PBA) is proposed in this paper.Multi-agents are used to develop the model of CMS.Redundant cells are defined and redundant paths are taken out from the flexible processing routes.Besides,agent coalitions are established to reduce communication cost and to make the solution more global.Simulation results show that compared to the common scheduling rules and their combination,the proposed approach has significant advantages in five performances.
出处 《自动化学报》 EI CSCD 北大核心 2012年第6期969-975,共7页 Acta Automatica Sinica
基金 国防基础科研重点项目(A0920110023) 北京市自然科学基金(4122069)资助~~
关键词 单元制造系统 跨单元调度 柔性路径 多代理 信息素 Cellular manufacturing systems(CMS) inter-cell scheduling flexible route multi-agent pheromone
  • 相关文献

参考文献13

  • 1王晓晴,唐加福.基于分散搜索的零部件跨单元生产的单元管理方法[J].机械工程学报,2009,45(10):125-131. 被引量:7
  • 2蒋义伟,魏麒.图形处理中一类Flow-shop问题的改进算法[J].自动化学报,2011,37(11):1381-1386. 被引量:4
  • 3Yang W H, Liao C J. Group scheduling on two cells with intercell movement. Computers and Operations Research, 1996, 23(10): 997--1006.
  • 4Garza O, Smunt T L. Countering the negative impact of in- tercell flow in cellular manufacturing. Journal of Operations Management, 1991, 10(1): 92-118.
  • 5Solimanpur M, Vrat P, Shankar R. A heuristic to minimize makespan of cell scheduling problem. International Journal of Production Economics, 2004, 88(3): 231-241.
  • 6Gholipour-Kanani Y, Tavakkoli-Moghaddam R, Khorrami A. Solving a multi-criteria group scheduling problem for a cellular manufacturing system by scatter search. Journal of the Chinese Institute of Industrial Engineers, 2011, 28(3): 192--205.
  • 7Tang J F, Wang X Q, Kaku I, Yung K L. Optimization of parts scheduling in multiple cells considering intercell move using scatter search approach. Journal of Intelligent Manu- facturing, 2010, 21(4): 525-537.
  • 8Elmi A, Solimanpur M, Topaloglu S, Elmi A. A simulated annealing algorithm for the job shop cell scheduling problem with intercellular moves and reentrant parts. Computers and Industrial Engineering, 2011, 61(1): 171-178.
  • 9Lin G Y J, Solberg J J. Effectiveness of flexible routing con- trol. International Journal of Flexible Manufacturing Sys- tems, 1991, 3(3-4): 189-211.
  • 10张长胜,孙吉贵,杨轻云,郑黎辉.一种求解车间调度的混合算法[J].自动化学报,2009,35(3):332-336. 被引量:13

二级参考文献66

共引文献73

同被引文献54

  • 1吴大为,陆涛栋,刘晓冰,孟永胜.求解作业车间调度问题的并行模拟退火算法[J].计算机集成制造系统,2005,11(6):847-850. 被引量:20
  • 2何大阔,王福利,贾明兴.遗传算法初始种群与操作参数的均匀设计[J].东北大学学报(自然科学版),2005,26(9):828-831. 被引量:59
  • 3彭传勇,高亮,邵新宇,周驰.求解作业车间调度问题的广义粒子群优化算法[J].计算机集成制造系统,2006,12(6):911-917. 被引量:30
  • 4Rheault M, Drolet J R, Abdulnour G. Dynamic cellular manufacturing system (DCMS). Computers and Industrial Engineering, 1996, 31(1-2): 143-146.
  • 5Garza O, Smunt T L. Countering the negative impact of intercell flow in cellular manufacturing. Journal of Operations Management, 1991, 10(1): 92-118.
  • 6Khaksar-Haghani F, Kia R, Mahdavi I, Kazemi M. A genetic algorithm for solving a multi-floor layout design model of a cellular manufactur-ing system with alternative process routings and flexible configuration. The International Journal of Advanced Manufacturing Technology, 2013, 66(5-8): 845-865.
  • 7Kia R, Baboli A, Javadian N, Tavakkoli-Moghaddam R, Kazemi M, Khorrami J. Solving a group layout design model of a dynamic cellular manufacturing system with alternative process routings, lot splitting and flexible reconfiguration by simulated annealing. Computers and Operations Research, 2012, 39(11): 2642-2658.
  • 8Gupta J N D, Schaller J E. Minimizing flow time in a flow-line manufacturing cell with family setup times. Journal of the Operational Research Society, 2006, 57(2): 163-176.
  • 9Tsai C H, Li R K. A due-date oriented scheduling heuristic for job shop cellular manufacturing system. International Journal of Industrial Engineering —— Theory Applications and Practice, 2000, 7(1): 76-88.
  • 10Solimanpur M, Elmi A. A tabu search approach for cell scheduling problem with makespan criterion. International Journal of Production Economics, 2013, 141(2): 639-645.

引证文献7

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部