摘要
针对目前城市人工景观水体存在的水量不足、自净能力低等问题,以重庆市大众湿地公园人工湖工程设计为例,介绍了城市人工湖的水量平衡设计、换水周期计算、雨水资源化利用、防渗处理及补水水源的选择,以期为类似城市人工景观水体的水量保障设计提供参考。
Problems of insufficient water quantity and low self-purification capacity exist for urban artificial landscape water bodies. Taking the design of artificial lake in Dazhong Constructed Wetland Park in Chongqing for example, the water quantity balance design, water change period calculation, rain- water utilization and anti-seepage treatment, make-up water source selection are introduced to provide a reference for water quantity design of similar urban artificial landscape water bodies.
出处
《中国给水排水》
CAS
CSCD
北大核心
2012年第12期55-58,62,共5页
China Water & Wastewater
基金
国家水体污染控制与治理科技重大专项(2009ZX07315-006)
关键词
人工湖
水量设计
雨水资源化利用
湖底防渗
artificial lake
water quantity design
rainwater utilization
anti-seepage at lake bottom