摘要 针对沥滘污水处理厂二期工程合流污水来流迅猛、水质波动大、常规处理难以适应等特点,采用了高密度沉淀池处理工艺。通过对照现行规范和手册标准,详细解析了该新工艺在投药搅拌、加砂循环、高速沉淀等工序的设计要点及设计参数。试运行结果表明,该工艺高效可靠,在进水水质远超设计值的情况下,COD、BOD5去除率分别达75%、70%,出水SS、TP稳定达到设计标准。 The combined sewage was characterized by rapid flow, large quality fluctuation and dif- ficult treatment with conventional methods. High-density sedimentation tank was used. By comparing with the current norms and standards, the design features and parameters of the process were analyzed, inclu- ding chemicals dosing and stirring, sand-adding and cycling, high-speed sedimentation. The trial opera- tion results showed that the process was efficient and reliable. Under the condition of influent quality far exceeding the design value, the removal rates of COD and BOD5 were 75% and 70% respectively, and the effluent SS and TP met the design criterion.
出处 《中国给水排水》 CAS CSCD 北大核心 2012年第12期59-62,共4页 China Water & Wastewater
关键词 高密度沉淀池 混凝 微砂 斜管沉淀 合流污水 high-density sedimentation tank coagulation micro-sand inclined-tube sedi-mentation combined sewage
  • 相关文献

参考文献6

二级参考文献24

  • 1龚卫俊,郑燕,吴志超.ACTIFLO高效沉淀工艺用于污水处理[J].中国给水排水,2005,21(10):104-106. 被引量:16
  • 2沈裘昌,邬亦俊.上海长桥水厂的老系统改造及深度处理规划[J].中国给水排水,2006,22(4):23-25. 被引量:4
  • 3杨饮 严照世.给水工程[M].北京:中国建筑出版社,1987..
  • 4[4]Jiang Yinghe.Optimum Inorganic Coagulant Used in CEPT to Treat Municipal Sewage with Low Concentration of Contaminant[A].Anthology of the 2nd China-Germany Symposium on Modern Architecture Technology[C].Wuhan,2002.
  • 5Victoria P,Claus P D. The ACTIFLO method[ J]. Water Sci Technol, 1998,37 ( 1 ) :269 - 275.
  • 6Nicolas Le Poder,Patrick Binot. Treatment of combined sewer overflow (CSO) with high speed microsand settling [A]. WEF CONFERENCE "New and Emerging Environmental Technologies and Products Conference for Wastewater Treatment and Storm Water Collection" [ C ]. USA : WEF, 1995.
  • 7Sampley W E, Sullivan W D. No longer under the weather - Bremerton adopts an effective combined sewer overflow control solution [ J ]. Pollut Eng,2002, ( 5 ) :24 - 27.
  • 8Keller John, Kobylinski A, Hunter G L, et al. Actiflo: a year' s worth of operating experience from the largest SSO System in the US[ A]. Proceedings of the Water Environment Federation[C]. USA : WEFTEC ,2005.
  • 9Ponist J B, Scheiter D. Ballasted high rate clarification process removes city of Greenfield, Indiana as a CSO community [ EB/OL ]. http ://www. krugerusa. com/eib/ kryger/1/CB80vc22c0dmlu663. Zuzhby. pdf, 2010 - 03 -21.
  • 10尤作亮,中国给水排水,1998年,14卷,5期

共引文献72

同被引文献49

引证文献11

二级引证文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部