斜沟煤矿煤巷围岩变形机理及控制方法 被引量:3

Coal Roadway Deformation Mechanism and Its Control Method in Xiegou Coal Mine
原文传递
导出
摘要 以早期煤巷掘进过程中揭露的围岩地质资料为基础,针对在煤巷掘巷和维护期间遇到的围岩易离层、片帮问题,深入研究了早期煤巷围岩变形机理,对煤巷掘进施工工艺和联合支护形式进行了优化,并应用数值模拟对新支护方案进行了分析,最后通过工程实例验证了新支护参数的合理性,为今后煤巷联合支护提供了经验。 On the basis of the surrounding rock geological data exposed in early coal lane tunneling process,aiming at the problems of abscission layer and rib spalling during tunneling and maintenance process,the surrounding rock deformation mechanism of early coal roadway was studied deeply,the tunneling construction techniques of coal lane and combined support form were analyzed,and the new supporting program was analyzed by numerical simulation.Finally,the rationality of new support parameters were verified by project,which provided valuable experience for the future roadway combined support.
作者 郭俊生
出处 《煤矿安全》 CAS 北大核心 2012年第6期158-160,共3页 Safety in Coal Mines
关键词 斜沟煤矿 煤巷围岩 浅部变形 围岩控制 联合支护 Xiegou coal mine roadway surrounding rock shallow deformation surrounding rock control combined support
  • 相关文献

参考文献3

二级参考文献2

  • 1[3]Diering D H.Ultra-Deep Level Mining-Future Requirements[J].Journal of the South African Institute of Mining and Metallurgy,1997 (6).
  • 2[4]Vogel M,Andrast H P.Alp Transit-Safety in Construction as A Challenge,Health and Safety Aspects in Very Deep Tunnel Construction[J].Tunneling and Under Ground Space Technology,2000 (4).

共引文献51

同被引文献5

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部