1[2]ADIANO C,ROTH A V.Beyond the House of Quality:Dynamic QFD.The Fifth Symposium on QFD[C].Novi,Michigan,1993.
2[3]PRASAD B.A Concurrent Function Deployment Techniques for a Workgroup-based Engineering Design process[J].Journal of Engineering Design,2000,11(2):103-119.
3[4]PRASAD B.Review of QFD and Related Deployment Techniques[J].Journal of Manufacture Sysem,1998,17(3):221-234.
4[5]MASUD A S M,DEAN E B.Using Fuzzy Sets in QFD[C].Proceedings of the 2nd Industrial Engineering Research Conference,1992.
5[6]ARMACOST R L.An AHP framework for Prioritizing Customer Requirement in QFD:an Industrialized Housing Application[J].JIE Transactions,1994,26(4):86-92.
6[7]FINE C H.Clockspeed:Winning Industry Control in the Age of Temporary Advantage[M].Perseus Books,1998.
7[8]FINE C H.Clockspeed-Based Strategies for Supply Chain Design[J].Production and Operations Management,2000,9(3):213-221.