期刊文献+

面向非线性工艺计划的动态多任务调度 被引量:4

Dynamic Multi- Tasks Scheduling toward Non- Linear Plan Planning
下载PDF
导出
摘要 提出了一个调度算法用来对具有非线性工艺的任务进行调度.它包括交货期算法和遗传调度算法,交货期算法根据主生产计划把产品计划分解为零件计划;然后利用改进的遗传算法实现具有非线性工艺的多个零件的动态调度.设计的遗传编码方法可以实现对具有非线性工艺的任务进行排序;改进的遗传操作算法可以避免非法解的产生,并适用于非线性工艺;设计的目标函数以确定的共有设备为基础进行计算。 The paper proposed a dynamic multi- tasks scheduling algorithm toward non- linear plan plan- ning.The algorithm includes two algorithm:due- date algorithm and genetic algorithm.Using due- date al- gorithm,productplans are decomposed into parts machining tasks,and using improved genetic algorithm, parts machining tasks'dynamic scheduling is realized.The genetic coding algorithm and the genetic opera- tion algorithms are modified to adapt to the tasks which have non- linear plan;and the latter can avoid wrong solutions.The function designing is based on assured equipment,which can fully reflect the pro- ducing states.
出处 《上海交通大学学报》 EI CAS CSCD 北大核心 2000年第3期400-403,共4页 Journal of Shanghai Jiaotong University
关键词 非线性工艺计划 生产 调度 CAPP 动态多任务调度 non- linear process planning production scheduling genetic algorithm
  • 相关文献

参考文献4

二级参考文献11

共引文献20

同被引文献75

  • 1张申生.从CIMS走向动态联盟[J].中国机械工程,1996,7(3):17-22. 被引量:89
  • 2田颖,江平宇,周光辉,赵刚.基于遗传算法的工艺规划与调度集成方法[J].西安交通大学学报,2006,40(9):1041-1044. 被引量:12
  • 3吴德中,严隽琪,王丽亚.CAPP与PPC的并行分布式集成研究[J].上海交通大学学报,1996,30(12):1-6. 被引量:15
  • 4陈俊.关系型产品模型.上海交通大学博士学位论文,1998
  • 5Sanjay Kumar Shukla,M. K. Tiwari,Young Jun Son.Bidding-based multi-agent system for integrated process planning and scheduling: a data-mining and hybrid tabu-SA algorithm-oriented approach[J]. The International Journal of Advanced Manufacturing Technology . 2008 (1-2)
  • 6W. J. Zhang,S. Q. Xie.Agent technology for collaborative process planning: a review[J]. The International Journal of Advanced Manufacturing Technology . 2007 (3-4)
  • 7Manish Kumar,Sunil Rajotia.Integration of process planning and scheduling in a job shop environment[J]. The International Journal of Advanced Manufacturing Technology . 2006 (1-2)
  • 8Wei Tan,Behrokh Khoshnevis.A linearized polynomial mixed integer programming model for the integration of process planning and scheduling[J]. Journal of Intelligent Manufacturing . 2004 (5)
  • 9Lihui Wang,Weiming Shen.DPP: An agent-based approach for distributed process planning[J]. Journal of Intelligent Manufacturing . 2003 (5)
  • 10H. Lee,S.-S. Kim.Integration of Process Planning and Scheduling Using Simulation Based Genetic Algorithms[J]. International Journal of Advanced Manufacturing Technology . 2001 (8)

引证文献4

二级引证文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部