摘要 乌东德水电站地处亚欧大陆地震带,其抗震性能受到广泛关注。采用"静力设计、动力调整"方法进行大坝体形设计,并采用现行抗震规范规定的基本分析方法与非线性有限元法对大坝选定体形的抗震性能与抗震安全性进行分析评价,提出了大坝抗震措施和强震监测设计方案。研究结果表明,乌东德高拱坝在设计与校核地震作用下,坝体应力状况较好,与国内几座高拱坝相比,应力水平较低,横缝开度较小,坝肩抗滑稳定裕度大,大坝-坝基系统具有较强的极限抗震能力。 Wudongde Hydropower Station is located in the Eurasian seismic belt, and its seismic safety draws extensive atten- tion. The method of “static design and seismic adjustment” is adopted in the design of the shape of arch dam. The basic analysis method specified by current seismic code and nonlinear FEM are used to analyze the seismic behavior and the seismic safety re- spectively. The anti - seismic measures and monitoring design scheme of strong earthquake are given. The results show that the stress status of Wudongde high arch dam is in a satisfying state under both design and check earthquake; comparing with other domestic high arch dams, the dam is proved to have lower stress level and smaller transverse joint opening, and the margin of anti - sliding stability of the abutments is relatively large and the dam - foundation system has strong limited seismic bearing capabili- ty.
出处 《人民长江》 北大核心 2012年第11期20-24,39,共6页 Yangtze River
基金 国家大坝安全工程技术研究中心研发课题(2011NDS021) 中国博士后科学基金(2012M511594) 湖北省博士后创新岗位资助
关键词 抗震设计 抗震安全性 高拱坝 乌东德水电站 anti -seismic design seismic safety high arch dam Wudongde Hydropower Station
  • 相关文献

参考文献3

  • 1水电水利规划设计总院.混凝土坝抗震安全评价体系研究报告[R].北京:水电水利规划设计总院,2011.
  • 2DL5073-2000.水工建筑物抗震设计规范[S].[S].,..
  • 3曹去修,向光红,崔玉柱.高地震烈度区特高拱坝抗震设计[J].水力发电,2009,35(5):52-55. 被引量:6

二级参考文献5

共引文献115

同被引文献36

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部