摘要 为检测变压器绝缘介质中的水分,采用极化去极化电流(PDC)和频域介电谱(FDS)相结合的介电谱测试方法用于变压器现场测试。PDC和FDS测试方法可区分出绝缘油和绝缘纸中的水分含量,为变压器绝缘评估提供依据,两者相结合进行测试可有效缩短现场测试时间,测试实例说明开展变压器介电谱测试是可行的。 In order to detect moisture in transformer's insulating medium, the dielectric spectroscopy test method, which combined polar- ization and depolarization current (PDC) with frequency domain dielectric spectroscopy (FDS), was used in transformers field test. The PDC and FDS test method could distinguish between the moisture content in the insulating oil and that of the insulating paper, which provided the basis for transformer insulation assessment. The combined test method can effectively shorten the time of field test and the test instance proves that the transformer dielectric spectroscopy test is feasible.
作者 王耀龙
出处 《电工电气》 2012年第6期29-33,共5页 Electrotechnics Electric
关键词 电力变压器 极化去极化电流(PDC) 频域介电谱(FDS) 介电谱测试 power transformer polarization and depolarization current frequency domain dielectric spectroscopy dielectric spectroscopy test
  • 相关文献

参考文献6

  • 1武坤,刘宏亮,杜大全,高树国,何瑞东,何磊.油浸式电力变压器老化状态评估方法[J].河北电力技术,2011,30(1):37-39. 被引量:4
  • 2Kuang Y C,Chen G,Jarman P.Recovery voltage measure-ment on oil-paper insulation with si mple geometry and con-trolled environment[].Proceedings of the IEEEInter-national Conference on Solid Dielectrics.2004
  • 3Y.Du,M.Zahn,B.C.Lesieutre,A.Mamishev,S.R.Lindgren.Moisture Equilibrium in Transformer paper-oil systems[].IEEE Electrical Insulation Magazine.1999
  • 4Saha T K,Purkait P.Investigation of polarization anddepolarization current measurements for the assessmentof oil-paper insulation of aged transformers[].IEEETransactions on Dielectrics and Electrical Insulation.2004
  • 5Yew J H,Saha T K,Thomas A J.Impact of Temper-ature on the Frequency Domain Dielectric Spectroscopy for the Diagnosis of Power Transformer Insulation[].IEEE Power Engineering Society General Meeting.2006
  • 6Koch M,Raetzke S,Krueger M.Moisture diagnostics of power transformers by a fast and reliable dielectric response method[].IEEE International Symposium on Electrical Insulation (ISEI).2010

二级参考文献3

  • 1DL/T438-2009火力发电厂金属技术监督规程[S].
  • 2王志永,裴江,马国鸿.火电厂受热面集箱主焊缝延迟裂纹分析及处理[C]//中国计量协会冶金分会2009年年会论文集.北京:《冶金自动化》杂志社,2009:896-899.
  • 3王志永,牛晓光,李树军,王庆,王永昕,王勇,裴江,石卫星.火电厂钢结构常见缺陷及可能性因素分析[J].河北电力技术,2009,28(3):47-48. 被引量:4

共引文献3

同被引文献11

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部