期刊文献+

一种基于车载双天线的GSM-R冗余网络无缝切换方案 被引量:11

On-board Dual-antenna Seamless Handover Scheme in GSM-R Redundant Network
下载PDF
导出
摘要 随着铁路现代化的发展,列车运行速度逐渐增加,由此导致列车在穿越GSM-R网络小区的过程中需要频繁地执行越区切换操作。由于GSM-R网络先断后连的硬切换方式必然造成切换过程中存在通信中断等问题,对行车造成一定的安全隐患。传统的切换优化方法仅针对单层网络中移动台越区切换过程进行改进,忽视了GSM-R系统现有的冗余网络配置特点。本文提出一种将GSM-R双层冗余网络中的不同基站组成一个为列车服务的虚拟小区,并采用车载双天线与虚拟小区进行协作通信的方案,以充分利用冗余网络配置特点,从而实现列车穿越小区过程中完成无缝切换操作。仿真结果表明:所提出的方案使切换中断率明显降低,为列车的安全运行提供了可靠保证。 Along with development of railway modernization, the train speed increases gradually, which causes the train to handover frequently when it passes through the cells of the GSM for Railway (GSM-R) network. Communication can be interrupted during the hard handover process (break-before-make), which will lead to some safety problems in train operation. Traditional handover optimization schemes only focus on improvement in handover processes in the single-layered network and ignore the existing redundant configuration characteristics of the GSM-R network. This paper proposed an optimized scheme, in which we combined different BSs in the GSM-R two layer redundant network into a virtual cell serving for the train and adopted cooperative communication between the on-board dual-antenna and virtual cell. The scheme takes full advantage of the redundant network configuration and achieves seamless handover when the train traverses through the cells. Simulation results show that the proposed scheme can decrease the outage probability remarkably during handover and guarantee safe train operation.
出处 《铁道学报》 EI CAS CSCD 北大核心 2012年第6期51-56,共6页 Journal of the China Railway Society
基金 铁道部科技研究开发计划(2009X009-E) 轨道交通控制与安全国家重点实验室(北京交通大学)开放课题基金(RCS2008K002)
关键词 GSM-R 切换 冗余网络 虚拟小区 协作 中断率 GSM-R handover redundant network virtual cell cooperation outage probability
  • 相关文献

参考文献10

  • 1JEON S,LEE S.A Relay-assisted Handover Techniquewith Network Coding over Multihop Cellular Networks[J].IEEE Communications Letter,2007,11(3):252-254.
  • 2黄吉莹,马君,钟章队.客运专线中GSM-R越区切换的研究[J].铁道通信信号,2006,42(5):51-53. 被引量:17
  • 3吴昊,谷勇浩,钟章队.一种应用于高速铁路的GSM-R快速切换算法研究[J].铁道工程学报,2009,26(1):92-96. 被引量:18
  • 4LI Ye,YAN Yu-song.Fuzzy Logic Based Handoff Deci-sion Algorithm in GSM-R Network[J].IET Conference onWireless,Mobile and Sensor Networks,2007,(12):505-508.
  • 5TSAGKARIS K,TSELIKAS N D,PLEROS N.A Han-dover Scheme Based on Moving Extended Cells for 60GHzRadio-over-Fiber Networks[J].IEEE International Con-ference on Communications,2009,(6):1-5.
  • 6PLEROS N,VYRSOKING K,TSAGKARIS K,TSELI-KAS N D.A 60GHz Radio-Over-Fiber Network Architec-ture for Seamless Communication with High Mobility[J].Journal of Lightwave Technology,2009,27(12):1957-1967.
  • 7BAHL P,ADYA A,PADHYE J.Reconsidering WirelessSystems with Multiple Radios[J].ACM SIGCOMMComputer Communication Review,2004,(5):39-46.
  • 8BRIK V,MISHRA A,BANERJEE S.Eliminating Handoff La-tencies in.802.11WLANs Using Multiple Radios:Appli-cations,Experience,and evaluation[J].Proceedings of the5th ACM SIGCOMM Conference on Internet Measure-ment,2005,(10):27-33.
  • 9邹复民.基于多无线模块的快速AP间切换实验研究与分析[J].科学技术与工程,2009,9(20):6193-6196. 被引量:2
  • 10International Union of Railways(UIC).GSM-R Procure-ment Guide V.5.0-01.02.2007[S].2007:112-114.www.uic.asso.fr.

二级参考文献15

  • 1李如玮.GSM-R系统越区切换实现方案的研究[J].移动通信,2005,29(5):93-97. 被引量:4
  • 2黄吉莹,马君,钟章队.客运专线中GSM-R越区切换的研究[J].铁道通信信号,2006,42(5):51-53. 被引量:17
  • 3钟章队,任静.对国内外GSM-R发展的研究[J].移动通信,2007,31(7):56-61. 被引量:11
  • 43GPP TS 03.09, v 5.1.0, Digital Cellular Teleeommunications System (Phase 2 + ) ; Handover procedures. 14 - 15, 16-18.
  • 53GPP TS 08.08, v 7.2. O, Digital Cellular Telecommunications System ( Phase 2 + ) ; Mobile - services Switching Centre - Base Station System ( MSC - BSS) interface; Layer 3 specification : 23 - 27.
  • 63GPP TS 08.58, v 7.1.0, Digital Cellular Telecommunications System (Phase 2 + ) ;Base Station Controller - Base Transceiver Station( BSC - BTS) interface;Layer 3 specification: 16.
  • 7Mishra A, Shin M, Arbaugh W. An empirical analysis of the IEEE 802.11 MAC layer handoff process. ACM Computer Communication Review, 2003 ;33(2) : 93--102.
  • 8Shin M ho, Mishra A, Arbaugh W. Improving the latency of 802.11 handoffs using neighbor graphs . In: Proc Of the 2nd International Conference on Mobile Systems Applications and Services, Boston, USA, 2004.
  • 9Liao Y, Gao Y. Practical schemes for smooth MAC layer handoff in 802.11 wireless network. In : Proc of IEEE Symposium on a World of Wireless, Mobile and Multimedia Networks, New York, USA,2006.
  • 10Ramani I, Savage S. Syncscan: practical fast handoff for 802.11 infrastructure networks. In Proc of INFOCOM 2005, Miami, USA, 2005.

共引文献31

同被引文献78

  • 1杨锐.分布式基站在我国铁路GSM-R系统中的应用研究[J].铁路技术创新,2011(2):64-66. 被引量:7
  • 2何蓉,陈晓宇,张小津.GSM-R双网主备分担方式下切换容限参数设置的研究[J].铁道通信信号,2005,41(11):47-49. 被引量:1
  • 3马君,黄吉莹,钟章队.GSM-R双层网络的设计与应用[J].电气化铁道,2006(4):45-47. 被引量:8
  • 4曾召华.LTE基本原理与关键技术[M],西安:西安电子科技大学出版社,2010.
  • 5刘潜,高杰复,黄吉莹.GSM无线覆盖盲区及相关参数设置的研究[C]//2005年移动通信网络规划与优化研讨会论文集,2005:162-165.
  • 6贺臻帧.基于LTE-R的高速移动宽带通信系统切换技术研究[D].[硕士论文],中南大学,2013.
  • 7Piro G and Boggia G.Two-level downlink scheduling for real- time multimedia services in LTE networks[J].IEEE Transactions on Multimedia,2011,13(5):1052-1065.
  • 8Capozzi F and Grieco L A.Downlink packet scheduling in LTE cellular networks:key design issues and a survey[J].IEEE Communications Surveys & Tutorials,2013,17(2):678-700.
  • 9赵治.LTE系统原理及应用[M].北京:电子工业出版社,2012:57-194.
  • 10Yuan Cao, Baigen Cai, Tao Tang, et al. Reliability A- nalysis of CTCS Based on two GSM-R Double Layers Net- works Structures [ C ]. 2009 International Conference on Communications and Mobile Computing,2009.

引证文献11

二级引证文献49

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部