马钢热电厂为了多烧高炉煤气多发电 ,对 2 0 0 t/ h煤粉锅炉实行了动力配煤 ,对高炉煤气烧嘴和给煤系统、汽轮机进行了改造 ,使高炉煤气用量达到 2万 m3/ h,机组能力由 5万 k Wh增加到 6万 k
For burning more BFG and generating more electricity,using power to mix coal is practised in pulverized coal boiler(200t/h);BFG nozzle,coal supplying system,steam turbine are modified,which make the using amount of BFG attain 20000m 3/h and motor assembly capability increase from 50000kWh to 60000kWh.