摘要
分析了宝安站35 kV并联电容器外熔断器误动的原因,比较了外熔断器和内熔丝的运行特点。针对宝安站并联电容器的具体情况,分析了取消外熔丝、只使用内熔丝和继电保护的可行性,并以单芯电缆替换原先的外熔断器对电容器组进行改造,经过一年多时间运行检验,说明该方法有效可行,提高了电容器运行可靠性,减轻了运行维护工作量。
The cause of malfunction of external fuse of 35 kV shunt capacitor at Bao'an station is ana- lyzed and operating characteristics of external fuse and internal fuse is compared. For the specific cir- cumstance of shunt capacitor at Bao'an station, the feasibility of removing external fuse and only u- sing the internal fuse and relaying protection. The capacitor bank can be modified by way of repla- cing original external fuse with single core cable. Through more than one-year operation, it is proved that the method is feasible, the operation reliability is improved and the maintenance work is re- duced.
出处
《电力电容器与无功补偿》
2012年第3期65-68,共4页
Power Capacitor & Reactive Power Compensation
关键词
电容器
内熔丝
外熔断器
不等臂双星形接线
不平衡电流保护
capacitor
internal fuse
external fuse
current protection unequal double star connection
unbalance