期刊文献+

考虑抽水蓄能机组的机组组合模型及求解 被引量:28

Unit Commitment Problem with Pumped-storage Units
下载PDF
导出
摘要 在传统机组组合模型的基础上,建立了抽水蓄能机组模型。结合混合整数规划原理,根据抽水蓄能机组的运行特性,建立了其各工作状态的虚拟机模型及工作状态转换模型。利用IEEERTS 96系统对该模型进行测试。测试结果表明,该模型易于与传统机组组合模型结合并能有效解决抽水蓄能机组工作状态转移及出力分配问题。 A pumped-storage unit model is developed based on the conventional unit commitment model. According to the operating characteristics of pumped-storage units, virtual unit models for each operating mode as well as working state transition models are developed based on mixed integer programming principle. The IEEE RTS 96 system is used to test these models. The test results show that the proposed models can be easily combined with conventional unit commitment model, and it is effective to schedule the pumped storage units and deal with the operating mode transition problem.
出处 《电力系统自动化》 EI CSCD 北大核心 2012年第12期36-40,共5页 Automation of Electric Power Systems
基金 国家自然科学基金资助项目(51177019) 国家电网公司科技项目"华北电网间歇式能源日前日内协调优化调度系统研究与开发"~~
关键词 机组组合 抽水蓄能机组 调峰 状态转移 混合整数规划 unit commitment pumped-storage unit peak load regulation mode transition mixed integer programming
  • 相关文献

参考文献11

二级参考文献47

共引文献103

同被引文献300

引证文献28

二级引证文献308

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部