基建项目投资清理后的清概分劈、末次计价及移交组固工作

Budget Estimate Clearing and Splitting、the End Time Valuation and Handing Over Solid Group Work After Infrastructure Project Investment Cleaning
下载PDF
导出
摘要 为使铁路基建项目合理有效地履行竣工决算、转固销号程序,需要对项目投资清理后进行清概分劈、末次计价及移交组固工作。这项工作操作繁杂、业务性强、责任重大。此文从工作前提与背景、工作原则、工作内容、遗留问题与建议等4个方面进行认真思考和分析,旨在依法合规履行建设程序,规范投资控制行为,为投资清理后的决算、销号工作起到抛砖引玉的作用。 To reasonablely and effectively fulfill the final accounts of the completed project and fixed assets transfer and number abolishing, the budget estimate clearing and splitting,the end time valuation and handing over solid group work after infrastructure project investment cleaning shuold be done. The work operates multifarious, has strong business and significant responsibility. The four aspects that the job premise and background, work principle, work content, the problem and suggestions are seriously considered and analyzed in this article to perform in accordance with the construction procedure, regulate investment control behavior.
出处 《铁路工程造价管理》 2012年第3期39-41,共3页 Railway Engineering Cost Management
关键词 基建项目 清概分劈 末次计价 移交组固 infrastructure projects budget estimate clearing and splitting The end time valuation hand over solid group
  • 相关文献

参考文献10

  • 1铁道部.铁路建设项目工程总承包标准施工招标文件补充文本(试行)[M].北京:中国铁道出版社,2009.
  • 2铁道部.铁路建设项目总价承包标准施工招标文件补充文本(试行)[M].北京:中国铁道出版社,2009.
  • 3铁计[2007]97号,铁路基本建设项目投资控制管理办法[S].
  • 4铁建设2006]211号,铁路建设工程验工计价办法[S].
  • 5铁建设[2006]113号,铁路基本建设工程设计概(预)算编制办法[S].
  • 6建建2007]72号,建设项目管理机构管理办法指南-验工计价管理[S].
  • 7铁财[2008]250号,铁路基本建设项目竣工财务决算编制和资产交付办法[S].
  • 8铁财[2005]235号,铁路运输企业固定资产管理办法[S].
  • 9铁建设[2009]46号,关于铁路建设项目实施阶段材料价差调整的指导意见[S].
  • 10铁建设[2005]146号,铁路建设项目变更设计管理办法[S].

共引文献11