1000 MW超超临界燃煤机螺栓加固技术

BENEFITS TO POWER PLANT 1 000 MW ULTRA-SUPERCRITICAL COAL-FIRED BOLT REINFORCEMENT
下载PDF
导出
摘要 介绍了惠来电厂4号机(1 000 MW)超超临界燃煤汽轮发电机组运转层施工中,预埋螺栓加固架的整体设计、制造、安装等施工技术。就如何根据现场实际情况合理利用材料资源,有效降低工程造价,确保螺栓埋设精度,达到符合设计与满足安装精度要求作了重点描述。 This article describes the benefits to power plant unit 4( 1 000 MW) the construction of ultra - supercritical coal - fired turbine generator operation, the embedded bolt reinforcement frame of the overall design, manufacture, installation and other construction technology. In accordance with the actual situation of the site on how the rational use of material resources ,reduce the project cost, to ensure that the bolts buried accuracy to meet the design and meet the installation precision requirements were the focus of description.
作者 蔡天机
出处 《建筑技术开发》 2012年第6期52-54,68,共4页 Building Technology Development
关键词 超超临界燃煤汽轮发电机组 整体设计 预埋螺栓加固架 施工技术 ultra-supercritical coal-fired turbine generator group the overall design reinforcement frame embedded bolts construction technology
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部