期刊文献+

新式A/O/A/O型SBR用于同步除磷脱氮的工艺研究 被引量:8

SIMULTANEOUS PHOSPHORUS AND NITROGEN REMOVAL BY A NEW SBR WITH A/O/A/O PROCESS
原文传递
导出
摘要 以沈阳建筑大学生活区的生活污水为研究对象,采用A/O/A/O型SBR系统富集反硝化聚磷菌实现同步除磷脱氮,研究温度、pH、不同碳源对同步除磷脱氮效果的影响。试验结果表明:A/O/A/O型SBR系统在厌氧2 h、好氧1.5 h、缺氧1.5 h、好氧0.5 h的方式下运行,成功富集了反硝化聚磷菌。温度为25℃,pH=7.5,以乙酸钠为碳源时,A/O/A/O型SBR系统对COD、TN、TP的去除率分别达到90%、88%和92%,出水效果达到GB 18918—2002《城镇污水处理厂污染物排放标准》的一级A标准。好氧时间由3 h缩短为2 h,可以节省约33%的能耗。 The sewage in the residential area of Shenyang Jianzhu University is taken as a research object,using A/O/A/O SBR system to realize train the denitrifying phosphorus enrichment bacteria to realize simultaneous phosphorus and nitrogen removal, aiming to study how the temperature, pH, different carbon sources make influence on simultaneous phosphorus and nitrogen removal. The results of the test show that when the SBR system runs in the mode of anaerobic 2 h, aerobic 1.5 h, anoxia 1.5 h, aerobic 0. 5 h, enrich the denitrifying phosphorus enrichment bacteria can be enriched successfully. In the environment of 25℃ , pH = 7.5,with acetic acid sodium for carbon sources, the removal rate of COD, TN, TP reached 90%, 88% and 92% respectively in the SBR system. The effluent is up to the flrst-order A standard of "the Urban Sewage Treatment Plant Emissions Standards"( GB 18918-2002). The aerobic time is reduced from 3 h to 2 h, which can save 33% of the energy.
出处 《环境工程》 CAS CSCD 北大核心 2012年第3期38-41,共4页 Environmental Engineering
基金 辽宁省教育厅重点实验室项目(2009S084)
关键词 SBR 同步脱氮除磷 COD SBR simutaneous phosphorus and nitrogen removal COD
  • 相关文献

参考文献5

二级参考文献24

  • 1沈耀良,玉宝贞.废水生物除磷工艺中聚磷菌的作用机制及运行控制要点[J].环境科学与技术,1995(2):11-16. 被引量:23
  • 2MervynC.Goronszy,朱明权,K.Wutscher.循环式活性污泥法(CAST)的应用及其发展[J].中国给水排水,1996,12(6):4-10. 被引量:88
  • 3Kuba T,van Loosdrecht M C M, Heijnen J J. Phosphorus and nitrogen removal with minimal COD requirement by integration of denitrifying dephosphatation and nitrification in a two-sludge system[J].Wat.Res, 1996,30:1702-1710.
  • 4Mino T. Microbiology and biochemistry of the enhanced biological phosphate removal process[J].Wat.Res,1997,32:3193-3207.
  • 5van Loosdrecht M C M. Biological phosphorus removal processes[J].Microbiol Biotechnol,1997,48:289-296.
  • 6Kuba T, Wschameister A,Van Loosdrecht M C M. Effect of nitrate on phosphorus release in biological phosphorus removal system [J]. Wat.Sci.Tech, 1994,30(6):263-269.
  • 7Merzouki M, Bernet N. Biological denitrifying phosphorus removal in SBR:effect of added nitrate concentration and sludge retention time[J].Wat.Sci.Tech,2001,43(3):191-194.
  • 8Vle K Ke, Comeau Y, Oldham W K. Biological phosphorus removal from wastewater with oxygen or nitrate in sequencing batch reactors[J].Environ.Tech.,1988,9:791-796.
  • 9Wanner J,Cech J S, Kos M. New process design for biological nutrient removal[J].Wat.Sci.Tech.,1992,25:445-448.
  • 10Kerrn,Jespersen J P, Henze M. Biological phosphorus uptake under anoxic and aerobic conditions[J].Wat.Res.,1993,27:617-624.

共引文献227

同被引文献143

引证文献8

二级引证文献73