林白铁路最大冻土深度取值的研究

Research on Maximum Depth Computing of Frozen Soil along Linbai Railway
下载PDF
导出
摘要 通过穿越大兴安岭的林白铁路的实地调查研究和设计实践,发现设计时采用最大冻土深度取值不当,容易造成一些问题,冻深取值大了造成工程的浪费、取值小了容易出现冻害隐患,经过研究得到了较好的解决方案,即采用5个修正系数,对不同的工程部位采用不同的设计冻深,其范围在1.2~3.2 m之间,取得了较好效果。 Through the field investigation and design practice on Linbai Railway across Great Khingan, it is found that improper computing of maximum frozen soil depth in design would cause some troubles easily. The bigger value would lead to project cost; or smaller one risk freezing injury. The preferable resolution is obtained through research that five correction factors are adopted and different values of the design depth within 1.2 - 3.2 m are used against different engineering positions, resulting in good effect.
出处 《路基工程》 2012年第3期127-129,共3页 Subgrade Engineering
关键词 林白铁路 最大冻土深度 冻深取值 Linbai Railway maximum frozen soil depth depth computing
  • 相关文献

参考文献9

  • 1沙志伟,普布,毛雪松.青藏公路多年冻土区碎石路基试验工程的降温分析[J].路基工程,2011(1):140-143. 被引量:7
  • 2王多青.青藏铁路格拉段路基工程设计[J].路基工程,2010(1):12-14. 被引量:5
  • 3TBl0002.5-2005铁路桥涵地基和基础设计规范[S].北京:中国铁道出版社,2005.
  • 4TBl0002.5-2010铁路混凝土结构耐久性设计规范[S].北京:中国铁道出版社,2010.
  • 5铁道部第三勘测设计院,桥涵地基和基础[S].北京:中国铁道出版社.2002.
  • 6JTGD63-2007公路桥涵地基与基础设计规范[S].北京:人民交通出版社,2007.
  • 7JTG/TB07-01-2006公路工程混凝土结构防腐蚀技术规范.[S]北京:人民交通出版社,2006.
  • 8GB/T50476--2008,混凝土结构耐久性设计规范[s],北京:中国建筑工业出版社,2009.
  • 9.GB50007-2002建筑地基基础设计规范[S].北京:中国建筑工业出版社,2002..

二级参考文献13

共引文献289

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部