摘要 为解决超长冷弯钢板桩沉桩困难、易扭曲变形等问题,在理论分析的基础上推导了自重作用下细长桩的最大稳定直立长度计算公式和桩体可承受的激振力公式,为超长钢板桩的施工工艺选择提供理论依据,并在某修船坞围堰工程冷弯钢板桩施工中得到验证。解决了冷弯钢板桩易变形扭曲沉桩困难等问题,提高了工作效率。 To solve the problems in driving of long cold-formed steel sheet piles such as difficulties in pile driving and easy distortion and deformation of piles, this paper derives, on the basis of theoretical analysis, a formula to calculate the maximum vertical length of a slender piles under its own weight and a formula to calculate the exciting force that a pile can withstand, which provides theoretical basis for selection of construction process for extra-long steel sheet piles and which has been veri- fied in the construction of a cofferdam for a ship-repairing dock. The problems in driving of long cold-formed steel sheet piles was then solved the problems and the working efficiency was improved.
出处 《中国港湾建设》 2012年第3期38-40,共3页 China Harbour Engineering
关键词 超长 冷弯钢板桩 沉桩 理论分析 工程实践 extra-long cold-formed steel sheet pile pile driving theory analysis engineering practice
  • 相关文献

参考文献3

二级参考文献13

  • 1刘润,禚瑞花,闫澍旺,林源.动力打桩一维波动方程的改进及其工程应用[J].岩土力学,2004,25(z2):383-387. 被引量:22
  • 2刘润,禚瑞花,闫澍旺.大直径钢管桩土塞效应的判断和沉桩过程分析[J].海洋工程,2005,23(2):71-76. 被引量:40
  • 3American Petroleum Institute. SY/T4802-92 Recommended Practice for Planning, Designing and Constructing Fixed Off-shore Platforms-Work Stresses Method [S]. USA, 1992.10.
  • 4Gere J M,Timoshenko S P. Mechanics of Materials[ M]. New York: Van Nostrand Reinhold, 1984.
  • 5刘鸿文.材料力学[M](第3版)[M].北京:高等教育出版社,1998.25-30,295-303.
  • 6水谷裕.钢管桩振动下沉计算[M].日本建设机械调查株式会社,1966.
  • 7法国PTC公司.PTC振动沉桩介绍与说明[R].2002.
  • 8美国ICE公司.ICE振动桩机[R].2002.
  • 9欧洲钢板桩技术协会.欧洲钢板桩施工方法[M].张伟译.天津:中交第一航务工程局有限公司,2007.
  • 10JTJ222-87,港口工程技术桩基规范[S].

共引文献40

同被引文献5

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部