期刊文献+

基于蒙特卡洛的红外成像产品装配风险分析 被引量:1

Method for Assembly Risk Analysis of a Infrared Imaging Product Based on Monte-Carlo
下载PDF
导出
摘要 通过某型红外成像导引产品的具体实例,首次将蒙特卡洛统计仿真方法应用于精密产品装配风险量化分析,达到了用量化的风险概率描述装配风险的目的。实例给出了精密光机部件的装配使用风险概率,为高新武器研发,以及如何在装配前预测装配风险提供了一个可准确量化的方法,避免盲目装配后带来的后续经济、时间上的损失,得到了蒙特卡洛统计仿真方法可在装配风险预测中实际应用的结论。 By a certain type of infrared imaging guidance' s specific instance, for the first time the Monte-Carlo simulation method is used in the risk quantitative analysis of precise statistics product assem- bly, and reaches the purpose that using the quantized risk probability to describe assembling risk. In- stance gives the risk probability of assembly use of precision optical-machanical parts, provides a precise quantitative method for high-tech weapons R&D and the risk prediction. The subsequent economic and time loss caused by blind assembly are avoided, and the conclusion that Monte-Carlo simulation statistics is available in the practical application of assembly risk prediction.
出处 《航空兵器》 2012年第3期61-64,共4页 Aero Weaponry
关键词 蒙特卡洛 统计 仿真 不合格品 风险 武器研制 Monte-Carlo statistics simulation nonconforming-part risk weapon development
  • 相关文献

参考文献4

二级参考文献18

  • 1王兴海 周迢.机器人工作空间的数值计算[J].机器人,1988,2(1).
  • 2John.J.Craig..机器人学导论[M]..北京:机械工业出版社,,2006....
  • 3Kamara J M,Anumba C J,Evbuomwan N F O.Assessing the suitability of current briefing practices in construction with a concurrent engineering framework[J].International Journal of Project Management,2001,19(6):337-351.
  • 4Maheswari J U,Varghese K,Sridharan T.Application of dependency structure matrix for activity sequencing in concurrent engineering projects[J].Journal of Construction Engineering and Management,2006,132(5):482-490.
  • 5Winner R I,Pennell J P,Bertrand H E,et al.The role of concurrent engineering in weapons system acquisition[R].Virginia:Institute for Defense Analyses,1988.
  • 6Altus S S,Kroo I M,Gage P J.A genetic algorithm for scheduling and decomposition of muhidisciplinary design problems[J].Journal of Mechanical Design,1996,118 (4):486--489.
  • 7Austin S,Baldwin A,Li B,et aL Analytical design planning technique (ADEPT):a dependency structure matrix tool to schedule the building design process[J].Construction Management and Economics,2000,18 (2):173-182.
  • 8Steward D V.System analysis and management:Structure,strategy and design[M].New York:Petrocelli Books,1981.
  • 9Browning T R,Eppinger'S D.Modeling impacts of process architecture on cost and schedule risk in product development[J].IEEE Transactions on Engineering Management,2002,49(4):428-442.
  • 10Meier C,Yassine A A,Browning T R.Design process sequencing with competent genetic algorithms[J].Journal of Mechanical Design,2007,129(6):566-585.

共引文献56

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部