摘要
我国电力工程项目仍普遍存在严重的概算超估算、预算超概算、决算超预算的"三超"造价失控现象,严重影响了国家电力建设工程的经济效益,文章从如何控制工程造价,优化电力工程设计方案进行相关总结探讨。
China's electric power project is still common serious budget for the ultra-estimate, budget ultra estimates, accounts ultra-budget "three excesses" cost out of control, seriously affecting the economic benefits of the NationAl Power Construction Engineering, the article from your many years of IOKV and below power engineering design work experience, on how to control project cost, optimizing the electrical engineering design related summary explore.
出处
《湖南农机(学术版)》
2012年第1期129-129,131,共2页
Hunnan Agricultural Machinery