摘要
兰新铁路第二双线张掖~红柳河段站前工程LXS-14标段清泉段地质条件软弱,地基采用CFG桩和水泥土、水泥卵砾石复合地基施工技术,再在其上填筑AB组料,从路基压实系统工作原理、系统特点,路基填筑施工方法、质量、环境保护、安全控制措施等六方面阐述路基压实系统在AB组填料中的运用。
The soil texture in Qingquan section of Section LXS-14 of the before-station project from Zhanye to Hongliu River in the 2^nd line of Lanzhou-Xinjiang Line is weak and the construction technologies of the CFG pile and cement soil, cement gravel composite foundation are adopted for the subgrade, together with group A&B packing, This paper expounds the application of subgrade compaction system in group A&B packing from six aspects which are working principle of subgrade compaction system, system features, subgrade filling technology, quality, environmental protection, and safety control measures.