摘要
介绍单线铁路隧道无轨运输施工时,二次衬砌施工安全距离与现场掘进进度存在相互影响的情况。
In trackless transportation possibility that safe distance of secondary lining each other. Break the conventions. Tunnel loop. construction of one-way railway tunnel, there is the construction and on-site tunneling progress influences
出处
《石家庄铁路职业技术学院学报》
2012年第2期28-32,共5页
Journal of Shijiazhuang Institute of Railway Technology
关键词
单线铁路隧道
信誉评价指标
矛盾
无轨运输
会车道
安全
有效
one-way railway tunnel
reputation evaluation indicator
contradiction trackless transportation
loop
safety
effectiveness