U形结构楼房向内坍塌爆破拆除

Demolition Method of U-shaped Anbuilding by Introverted Collapse
下载PDF
导出
摘要 介绍了采用纵横向都有延时的逐段定向倾倒技术成功拆除1栋U形框架结构楼房的爆破拆除工程实例。该技术将U形结构楼房自两端向中间划分为若干个倒塌单元,通过爆破时差实现各单元有序逐段倒塌。楼房各相邻单元在倒塌过程中存在相互剪切拉伸等作用,既实现了楼房结构的充分解体,又有效控制了楼房倒塌的侧向位移。同时,采用上述爆破技术有效的控制了爆破时的单响药量,达到了控制爆破振动与塌落振动效应的目的。 Longitudinal delay and segment by segment directional demolition blasting of a U-shaped frame build- ing was introduced. Through this technology, the building was divided into a number of small units from both ends to mlddle in space and the units collapse orderly one by one through the blasting delay-time. The structure of the building was disaggregated adequately and the pressure displacement of the building was effective controllbd due to the interaction among the units. The technique reduce the explosive^charge effectively which controlled the blasting vibration and collapse vibration.
出处 《爆破》 CSCD 北大核心 2012年第2期76-79,共4页 Blasting
关键词 爆破拆除 纵横向延时 逐段坍塌 振动 blasting demolition longitudinal and transverse delay collapse segment by segment vibration
  • 相关文献

参考文献5

二级参考文献23

  • 1谭灵,王自力,谭雪刚,纪永适.控制爆破拆除十六铺客运大楼及申客饭店[J].爆破,2005,22(3):76-79. 被引量:8
  • 2郑德明,余德运,曹跃,谭海.合肥17层高楼原地坍塌拆除爆破[J].爆破,2006,23(1):48-51. 被引量:17
  • 3刘昌邦,韩传伟,严涛,贾永胜,罗启军.8层砖混结构楼房控制爆破拆除[J].工程爆破,2007,13(1):76-77. 被引量:7
  • 4杨人光.建筑物爆破拆除[M].北京:中国建筑工业出版社,1985..
  • 5亨利奇J.爆炸动力学及其应用[M].北京:科学出版社,1987..
  • 6GUO Yue-liang, ZUO Yu-jun,WANG Di-an. Discussion on Collapse Vibration Caused by Demolition Blasting [A]. New Development on Engineering Blasting APS Blasting 1[M], 2007 Kunming China. Beijing:Metallurgical Industry Press,2007.
  • 7周家汉,陈善良,杨业敏,戴铭荣.爆破拆除建筑物时振动安全距离的确定[A]:工程爆破文集(第三辑)[C].北京:冶金工业出版社,1988,112-119.
  • 8周家汉,金保堂,陈善良.高烟囱拆除爆破及塌落振动测量与分析[A].工程爆破文集(第七辑)[C].乌鲁木齐:新疆青少年出版社,2001,707-712.
  • 9于亚伦.工程爆破理论与技术[M](全国工程爆破作业人员统一培训教材).北京:冶金工业出版社,2004,323-358.
  • 10曲广建,崔允武,吴岩,等.温州市93m结构不对称楼房拆除爆破[A].中国典型爆破工程与技术[M].北京:冶金工业出版社,2006.

共引文献245

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部