10kV供配电工程施工交付用户使用后,因增容、环境所致和投入使用时间逐渐增长的原因,工程设备经常会出现故障而导致停电,文章就作者从事10kV电力工程施工及施工管理工作经验对如何规范10kV供配电工程急检修相关问题进行探讨。
10kV power supply and distribution construction delivered, due to capacity increase, the environment due to input the gradual growth of the use of time, engineering equipment often malfunction and cause power outages, article author in the lOkV power project construction and construction management work experiencehow to regulate the lOkV for distribution projects acute and maintenance-related issues to discuss.
出处
《湖南农机(学术版)》
2012年第2期262-263,共2页
Hunnan Agricultural Machinery
关键词
10kV
供配电
工程设备
10kV
supply and distribution
engineering equipment