锦屏水电站引水隧洞群长距离通风问题研究 被引量:1

Case Study on Construction Ventilation Method for Diversion Tunnels of Jinping Hydropower Station
下载PDF
导出
摘要 长距离通风一直是困扰长隧洞施工的一个难题。对锦屏二级水电站4#引水隧洞通风系统在运行过程中遇到的问题进行了分析,优化调整了掘进初期的通风方案。优化后的方案基本解决了掌子面污浊空气无法排出、新鲜风与污风相互干扰的问题,提高了风压及进风量,为引水隧洞的施工创造了有利条件。 The long distance ventilation is one of the main problems in long tunnel construction. The author analyzed the ventilation problem in the 4th tunnel of Jinping Hydropower Station and optimized the original solution. After optimization, fresh air circulation in tunnel face was improved and so did the wind pressure and air intake volume. The cross term interferences between stale and fresh air was decreased. This application created favourable conditions for the construction.
出处 《人民黄河》 CAS 北大核心 2012年第6期128-130,共3页 Yellow River
关键词 引水隧洞 通风 优化 锦屏水电站 diversion tunnel ventilation optimization Jinping ttydropower Station
  • 相关文献

参考文献2

二级参考文献5

  • 1Don. Rose. Conceptual layouts for very long tunnels [ J ]. Underground Space , 1985,9 ( 3 ).
  • 2M. Matsuo. An overview of the Seikan Tunnel project [ J ].Tunnelling and Underground Space Technology, 1986, (4).
  • 3Zuber, Peter. The AlpTransit Scheme: New Railway Lines in Base Tunnels under the Swiss Alps [ J ]. Tunnelling and Underground Space Technology , 1997,12 ( 3 ).
  • 4Marec,Michel. Major road tunnel projects - how far can we go[ J ]. Tunnelling and Underground Space Technology ,1996,11 (1).
  • 5赖涤泉.隧道施工通风预防尘[M].北京:中国铁道出版社,1994.

共引文献15

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部