浅述凝汽器的工地就位方案

Brief Description of the Field Positioning Scheme of a Condenser
下载PDF
导出
摘要 凝汽器的体积较大,在国内建造的传统模式中,常将凝汽器的散件发运到工地进行总装,这样可减少运输及工地吊装就位的难度。目前,特别在国外的电站项目中,常有将凝汽器总装后交货的模式,为此,凝汽器在工地就位的难度增大,也不能采用常规吊装方法,施工时也缺乏相关经验。现以巴西PECEM火电厂360MW机组凝汽器的工地就位方案为例,介绍整装交货凝汽器在工地就位的施工方法,旨在为整台凝汽器在工地的吊装施工提供参考。 In the traditional model of domestic construction, the condenser parts components are usually shipped to the working site for final assembly, which will reduce the difficulty of transportation and site lifting & positioning. Now, especially in the oversea power generation projects, the condenser is often delivered after final assembly. Therefore, the difficulty of the condenser positioning at the site will increase, the conventional lifting way cannot be adopted and the construction experiences can not be gathered enough. Now taking the position schedule of 360 MW Unit Condenser in Brazil PECEM Thermal Power Plant as the example, the construction method of the final assembled condenser at site position has been introduced in the paper in order to provide the reference for condenser liftin construction at site.
出处 《电站辅机》 2012年第2期36-40,共5页 Power Station Auxiliary Equipment
关键词 机组 凝汽器 工地 就位 吊装 方案 施工 总装 power unit condenser site position lifting scheme construction, final assembly
  • 相关文献

参考文献3

  • 1上海电站辅机厂.巴西PECEM项目360MW火电机组凝汽器供客资料[R].2009.
  • 2GB50017-2003.钢结构设计规范.[S].中华人民共和国建设部,..
  • 3DL5011—1992,电力建设施工及验收技术规范汽轮机机组篇[S].

共引文献309

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部