摘要
海洋平台需通过桩基与海床固定,桩基根据安装工艺不同分为:打桩桩、钻孔桩和吸力桩;随着海洋工程的发展,吸力桩越来越广泛地用作为系泊系统、水下生产系统及自安装式平台的桩基。以旅大32-2系缆平台为例,对吸力桩平台吸水灌入工艺进行介绍,可提供以后类似工程借鉴和参考。
Offshore platform is fixed to seabed by piles. There are various types of piles applied to the installation, such as driving piles, drilling piles and suction piles. With the development of offshore engineering, suctionpile is widely used as foundation for mooring system, manifold protection structure and self-installation platform. Suction piles are used as the foundation of Lvda32-2 MOP. Installation technologies including lifting rigging and derrick barge selection, barge position and suction penetrating are presented for this platform ,which provides a reference here for similar platform installation in future.