以鄂尔多斯机场改扩建-新航站楼项目为例,说明竖向设计时如何利用现状地形并结合建筑方案以减少土方量。
As an example, we select the new terminal which is a part of re-building and enlargement of Erdos Airport, and also show how to use the status terrains elevation considered with the whole construction plan in the design stage of elevation planning, in order to lower the earth volume of excavation.