摘要
碾压式沥青混凝土施工质量受工程所在地温度、气候等因素影响较大,对于极端寒冷地区施工在相应的规范中并没用特殊要求,施工组织难度较大,有冬季施工设备配套、温度控制、施工工艺参数、层面结合等问题需要解决。结合新疆库什塔依水电站碾压式沥青混凝土心墙坝施工环境及要求,通过现场沥青混凝土拌和、运输、摊铺及碾压温度控制试验研究及冬季施工实践,研究了该工程在室内配合比基础上根据现场调整的配合比,沥青混凝土拌和、运输、摊铺、碾压温度控制标准和措施。
The construction quality of roller compacted asphalt concrete is greatly influenced by the factors such as the temperature, climate of the construction site. For the construction in severe cold areas, there is no particular requirement in the standard, and it is difficult to construct. There are problems to be solved, such as equipment coordination, temperature control, technical parameters and layer combination. Combined with the construction environment and its requirement of roller compacted asphalt concrete corewall dam of Xinjiang Kushitayi hydropower station, a field test of mixing, transporting, paving, and roller compacting of asphalt concrete is carried out. They researched the adjusted mix proportion based on the mix proportion indoors, and the temperature control standard and measures about the mixing, transporting, paving, and roller compacting of asphalt concrete.
出处
《中国农村水利水电》
北大核心
2012年第6期172-175,共4页
China Rural Water and Hydropower
关键词
沥青混凝土
冬季施工
现场试验
温度控制
asphalt concrete
winter construction
field test
temperature control